Mercedes-Benz Of Long Beach

2300 East Spring St. Long Beach, CA 90755

2025 BMW M4 Competition at Mercedes-Benz Of Long Beach

2025 BMW M4 Competition

Selling Price : $84,992

Vehicle Photos

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M4
  • Condition : Used
  • Mileage : 4,678
  • VIN : WBS23HK00SCS48075
  • Stock # : 250660A
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Black
  • Int. Color : Black
  • Vehicle Type : Coupe
  • Body Style : 2D Coupe
  • Drivetrain : RWD
City MPG * 16 Hwy MPG * 23

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

CARFAX One-Owner. Clean CARFAX. This 2025 Black Sapphire Metallic BMW M4 Competition RWD is well equipped and includes these features and benefits: Connected Package Pro, Executive Package (BMW Curved Display w/HUD, Heated Steering Wheel, Power Tailgate, and Remote Engine Start), 16 Speakers, 4-Wheel Disc Brakes, ABS brakes, Adaptive suspension, Air Conditioning, Alloy wheels, AM/FM radio: SiriusXM with 360L, Apple CarPlay & Android Auto Compatibility, Audio memory, Auto High-beam Headlights, Auto-dimming door mirrors, Auto-dimming Rear-View mirror, Automatic temperature control, BMW Assist eCall, BMW TeleServices, Brake assist, Bumpers: body-color, Carbon Fiber Trim, Compass, ConnectedDrive Services, Delay-off headlights, Driver door bin, Driver vanity mirror, Dual front impact airbags, Dual front side impact airbags, Electronic Stability Control, Emergency communication system: BMW Assist eCall, Extended Merino Leather Upholstery, Exterior Parking Camera Rear, Four wheel independent suspension, Front anti-roll bar, Front Bucket Seats, Front Center Armrest, Front dual zone A/C, Front reading lights, Fully automatic headlights, Garage door transmitter, harman/kardon Surround Sound System, harman/kardon Speakers, Heated door mirrors, Heated Front Seats, Heated front seats, HVAC memory, Illuminated entry, Knee airbag, Leather Shift Knob, Leather steering wheel, Low tire pressure warning, Lumbar Support, M Compound Brakes w/Red Calipers, M Shadowline Lights, M Sport Seats, Memory seat, Navigation, Navigation System, Occupant sensing airbag, Outside temperature display, Overhead airbag, Overhead console, Panic alarm, Passenger door bin, Passenger vanity mirror, Personal eSIM 5G, Power door mirrors, Power driver seat, Power Front Seats, Power passenger seat, Power steering, Power windows, Radio data system, Radio: AM/FM Audio System, Rain sensing wipers, Rear anti-roll bar, Rear reading lights, Rear seat center armrest, Rear window defroster, Remote keyless entry, Security system, SiriusXM w/360L, Speed control, Speed-sensing steering, Speed-Sensitive Wipers, Split folding rear seat, Spoiler, Sport steering wheel, Steering wheel mounted audio controls, Tachometer, Telescoping steering wheel, Tilt steering wheel, Traction control, Trip computer, Turn signal indicator mirrors, Variably intermittent wipers, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M), Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Forged Black, and Widescreen Display.
Recent Arrival! Odometer is 2321 miles below market average!

Browse Other Vehicles at Mercedes-Benz Of Long Beach

Dealership Info

Mercedes-Benz Of Long Beach

Mercedes-Benz Of Long Beach

Vehicle Features

  • Navigation
  • Navigation System
  • Connected Package Pro
  • Executive Package
  • 16 Speakers
  • AM/FM radio: SiriusXM with 360L
  • Audio memory
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Radio data system
  • Radio: AM/FM Audio System
  • SiriusXM w/360L
  • Air Conditioning
  • Automatic temperature control
  • Front dual zone A/C
  • HVAC memory
  • Rear window defroster
  • Lumbar Support
  • Memory seat
  • Power driver seat
  • Power steering
  • Power windows
  • Remote Engine Start
  • Remote keyless entry
  • Steering wheel mounted audio controls
  • Adaptive suspension
  • Four wheel independent suspension
  • Speed-sensing steering
  • Traction control
  • 4-Wheel Disc Brakes
  • ABS brakes
  • Dual front impact airbags
  • Dual front side impact airbags
  • Emergency communication system: BMW Assist eCall
  • Front anti-roll bar
  • Knee airbag
  • Low tire pressure warning
  • M Compound Brakes w/Red Calipers
  • Occupant sensing airbag
  • Overhead airbag
  • Rear anti-roll bar
  • Power Tailgate
  • Brake assist
  • Electronic Stability Control
  • Exterior Parking Camera Rear
  • Auto High-beam Headlights
  • Delay-off headlights
  • Fully automatic headlights
  • Panic alarm
  • Security system
  • Speed control
  • Auto-dimming door mirrors
  • Bumpers: body-color
  • Heated door mirrors
  • M Shadowline Lights
  • Power door mirrors
  • Spoiler
  • Turn signal indicator mirrors
  • Apple CarPlay & Android Auto Compatibility
  • Auto-dimming Rear-View mirror
  • BMW Assist eCall
  • BMW Curved Display w/HUD
  • BMW TeleServices
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Driver door bin
  • Driver vanity mirror
  • Front reading lights
  • Garage door transmitter
  • Heated Steering Wheel
  • Illuminated entry
  • Leather Shift Knob
  • Leather steering wheel
  • Outside temperature display
  • Overhead console
  • Passenger vanity mirror
  • Personal eSIM 5G
  • Rear reading lights
  • Rear seat center armrest
  • Sport steering wheel
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Trip computer
  • Widescreen Display
  • Extended Merino Leather Upholstery
  • Front Bucket Seats
  • Front Center Armrest
  • Heated Front Seats
  • Heated front seats
  • M Sport Seats
  • Power Front Seats
  • Power passenger seat
  • Split folding rear seat
  • Passenger door bin
  • Alloy wheels
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Forged Black
  • Rain sensing wipers
  • Speed-Sensitive Wipers
  • Variably intermittent wipers

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.